Old railings on second floor where once were the balcony seats and where our Hall of Fame displays will be along the walls have been removed and replaced with new, higher, safer railings. 
An electrically operated chairlift to that 2nd floor was ordered a couple of weeks ago and should arrive in the coming days. Possibly a day is required for its installation. 
All three of the huge heat/ air conditioning units and venting are completed. The front porch has been poured with concrete. It has a ramp and steps are being added as we speak here. 
An insulated roof is completed. 
The complete gym has been insulated with blow in insulation in the walls. 
We are pleased with the progress. There will be other things to do, of course. Crawl before we walk. Walk before we run.